🏠 Dashboard · ☑ Progress · 🔎 Finder · 📚 Block · ← Previous · Next →
Sequence 087 — Gate A integration - Git basics and full readiness
Stage: Technology Gate A — Relational Foundation
Source: CDMP Master Execution Manual
When / purpose
Close the first technology gate with reproducibility and an independent test.
What you should learn
git status/add/commit/log/diffbasics.- No secrets.
- Rebuild from documented steps.
- SQL + PostgreSQL + DBeaver work together.
What to read / study
| Priority | Resource | Use now | Stop point |
|---|---|---|---|
| MUST | Technology Competency Roadmap | Use the exact active technology block and stopping boundary. | Do not study later blocks. |
| REFERENCE | Detailed Technology Competency Reference | Use only the section named by this card. | Do not convert the reference into a separate curriculum. |
Do this in order
- Initialize or inspect the local lab repo.
- Commit the environment/SQL baseline.
- From a clean editor, create a table with constraints, query it, join related data, validate results and save scripts.
- Use Git diff/log to explain what changed.
Meridian application
Use Meridian synthetic data and the local lab environment only when the card calls for practice.
Create / save
Gate A evidence packet + Git commit.
Stop / boundary
Stop at governance/data-management working depth; do not expand into DBA or engineering specialization.
Completion gate
You can perform the relational foundation workflow independently enough to begin Chapter 5.
NEXT → Sequence 088 — Chapter 5 source gate and orientation
Operationalized from the verified canonical 00C Master Execution Manual; not a verbatim transcription.
🏠 Dashboard · ☑ Progress · 🔎 Finder · 📚 Block · ← Previous · Next →