Skip to content

🏠 Dashboard · ☑ Progress · 🔎 Finder · 📚 Block · ← Previous · Next →

Sequence 087 — Gate A integration - Git basics and full readiness

Stage: Technology Gate A — Relational Foundation
Source: CDMP Master Execution Manual

When / purpose

Close the first technology gate with reproducibility and an independent test.

What you should learn

  • git status / add / commit / log / diff basics.
  • No secrets.
  • Rebuild from documented steps.
  • SQL + PostgreSQL + DBeaver work together.

What to read / study

Priority Resource Use now Stop point
MUST Technology Competency Roadmap Use the exact active technology block and stopping boundary. Do not study later blocks.
REFERENCE Detailed Technology Competency Reference Use only the section named by this card. Do not convert the reference into a separate curriculum.

Do this in order

  1. Initialize or inspect the local lab repo.
  2. Commit the environment/SQL baseline.
  3. From a clean editor, create a table with constraints, query it, join related data, validate results and save scripts.
  4. Use Git diff/log to explain what changed.

Meridian application

Use Meridian synthetic data and the local lab environment only when the card calls for practice.

Create / save

Gate A evidence packet + Git commit.

Stop / boundary

Stop at governance/data-management working depth; do not expand into DBA or engineering specialization.

Completion gate

You can perform the relational foundation workflow independently enough to begin Chapter 5.

NEXT → Sequence 088 — Chapter 5 source gate and orientation


Operationalized from the verified canonical 00C Master Execution Manual; not a verbatim transcription.


🏠 Dashboard · ☑ Progress · 🔎 Finder · 📚 Block · ← Previous · Next →