Skip to content

Current Migration Status

Original 00C migration checkpoint: 2026-08-15
00A status reconciled after the fresh Chapters 1–17 build: 2026-08-19
Study-site status reconciled: 2026-08-19

00C — Master Step-by-Step Execution / 333-page guide

✅ Canonical source: 330 execution sequences / 333 PDF pages.
✅ Sequences 001–330 are browser-native in GitHub.
✅ The final 00C continuation migrated Chapter 16 (265–277), Chapter 17 (278–290), Cross-Chapter Integration & Capstones (291–310), and Final CDMP Review / Exam Handoff / Career Proof (311–330).
330 of 330 sequences are online; no migration cards remain.
✅ Sequence 330 closes the execution route with the final readiness decision and handoff.

Historical separation rule

The completed 00C browser-native conversion did not itself authorize or create separate 00A mastery packages or 00B Meridian labs. That boundary was correct for the August 15 migration checkpoint and learner gates remain separate from interface migration.

Subsequent 00A status

After the 00C migration, the user separately directed the fresh 00A rebuild from the current Google Drive chapter packages.

All Chapters 1–17 now have complete current-source 00A mastery packages through Artifacts 01–07 and fresh GitHub-readable conversions.
✅ Every chapter now stores the original DMBOK source PDF locally in its private GitHub source/ folder.
✅ Every chapter has a Source & Formatted Originals panel linking its current Drive study artifacts.
✅ Artifact 08 remains learner-performance driven rather than prefilled.
⏸ Any still-unbuilt 00B Meridian labs / other non-00A gated artifacts remain separate applied-work decisions/gates and are not implied by 00A completion.

Subsequent Mastery / study-site status

Stage 5 — Cross-Domain Confusion & Integration foundation is complete.
🟡 Stage 6 — Exam Conditioning is in progress.
✅ Chapter-home study navigation has been standardized across Chapters 1–17.
✅ Master Topic Finder and Confusion Pair Finder are live.
✅ What Should I Study? router is live.
✅ Repository-wide UX/link/orphan audit is complete; closeout is recorded in docs/maintenance/STUDY-SITE-UX-AUDIT.md.
🔒 Current next interface phase: the larger website-style interface upgrade recorded in docs/00A-dmbok-mastery/site-upgrade-roadmap.md.

Current state

  • 00C browser-native manual migration: complete.
  • 00A fresh Chapters 1–17 conversion: complete.
  • Stage 5 cross-domain foundation: complete.
  • Stage 6 exam conditioning: in progress.
  • Study-site prerequisite Issues 1–4: complete.
  • Website-style interface upgrade: next.
  • Learner-status values: governed by the live Google checklist and not changed by migration, artifact builds or interface work.